Tima wastewater tunnel, France
MSD received an order to deliver 4 spoil containers for the crane operation with drop bottom emptying for construction of a 2260 m long wastewater tunnel in Paris.
In 2005, we delivered 5 spoil containers to our customer, Techni Metal Systemes.
These containers all have drop bottom emptying for crane operation.
The wastewater tunnel being built in Paris is to provide a buffer for Parisian water treatment, with a capacity of 80,000 cbm. The 2600 m tunnel will have a 6.8 m diameter. The boring diameter is therefore 7.75 m and the lining segments are 1.4 m long.
Tima wastewater tunnel, France
MSD received an order to deliver 4 spoil containers for the crane operation with drop bottom emptying for construction of a 2260 m long wastewater tunnel in Paris.
In 2005, we delivered 5 spoil containers to our customer, Techni Metal Systemes.
These containers all have drop bottom emptying for crane operation.
The wastewater tunnel being built in Paris is to provide a buffer for Parisian water treatment, with a capacity of 80,000 cbm. The 2600 m tunnel will have a 6.8 m diameter. The boring diameter is therefore 7.75 m and the lining segments are 1.4 m long.
Tima wastewater tunnel, France
MSD received an order to deliver 4 spoil containers for the crane operation with drop bottom emptying for construction of a 2260 m long wastewater tunnel in Paris.
In 2005, we delivered 5 spoil containers to our customer, Techni Metal Systemes.
These containers all have drop bottom emptying for crane operation.
The wastewater tunnel being built in Paris is to provide a buffer for Parisian water treatment, with a capacity of 80,000 cbm. The 2600 m tunnel will have a 6.8 m diameter. The boring diameter is therefore 7.75 m and the lining segments are 1.4 m long.
Tima wastewater tunnel, France
MSD received an order to deliver 4 spoil containers for the crane operation with drop bottom emptying for construction of a 2260 m long wastewater tunnel in Paris.
In 2005, we delivered 5 spoil containers to our customer, Techni Metal Systemes.
These containers all have drop bottom emptying for crane operation.
The wastewater tunnel being built in Paris is to provide a buffer for Parisian water treatment, with a capacity of 80,000 cbm. The 2600 m tunnel will have a 6.8 m diameter. The boring diameter is therefore 7.75 m and the lining segments are 1.4 m long.